Common Misconceptions About Net Metering in the Philippines Debunked

Common Misconceptions About Net Metering in the Philippines Debunked

Common Net-Metering Misconceptions in the Philippines

Net metering can improve the value of surplus solar production, but it is easy to confuse generation, export credits, backup power and regulatory approval. These distinctions help set realistic expectations.

Myth 1: The net-metering limit is now 1 MW

Meralco's current net-metering guidance states not more than 100 kW. A separate DER pathway covers certain larger projects. The previous version of this article incorrectly described DER-scale capacity as an expanded net-metering limit.

Myth 2: Exported electricity offsets imports one-for-one

Eligible exports earn peso credits using the applicable rate, which differs from the full retail import rate. Imports and exports have separate readings. Generating the same monthly kWh that you consume does not prove the bill will be eliminated.

Myth 3: Solar guarantees a zero bill or a fixed saving

Results depend on production, demand, rates, design, maintenance and costs. Some solar electricity is used directly, some may be exported, stored or curtailed. Ask for a site-specific estimate and the assumptions behind it.

There is no universal saving percentage, loan cash-flow result or household tax entitlement established by this guide. Compare financing charges and remaining electricity payments as well as expected savings.

Myth 4: Net metering provides outage backup

Bill credits are not stored electricity. A grid-connected installation must stop energising utility lines during an outage. Home backup depends on appropriate inverter, battery, transfer and isolation equipment. A battery is not a universal requirement for net-metering participation, and adding one requires the applicable review.

Myth 5: Export readings show all solar production

Export is only the surplus sent to the grid. Solar used on-site does not appear as exported energy. Track inverter generation alongside utility import and export readings. Weather and shading affect production; do not rely on a fixed cloudy-day percentage for every installation.

Myth 6: Solar automatically protects the roof

Mounting adds loads and connections that need assessment. Roof condition, structural capacity, attachment details and waterproofing matter. Ask for a project-specific assessment and written workmanship terms; panels do not guarantee longer roof life or prevent leaks.

Myth 7: Credits must be used up every year

The 2025 ERC amendments permit banking and rollover to current and future billing periods. Ownership transfers are conditional. Confirm account closure or transfer treatment with your utility rather than assuming automatic portability or cash redemption.

Myth 8: Approval is automatic once panels are installed

Meralco's process includes documents, technical evaluation, inspection, agreements, metering and commissioning. Confirm the required operating arrangement before use. A zero-export setting alone should not be treated as permission for any pending installation.

How to assess a proposal

Ask for the design, generation estimate, current tariffs, expected self-consumption, export-credit calculation and itemised costs. Compare written scope and verify contractor and professional credentials.

Corrected 16 November 2026: removed the false 1 MW ceiling, annual-expiry language and unsupported financial, tax and roof-protection promises.